Swimming Pool Internal Refurbishment, Stroud

ISS Acoustic & Interiors worked alongside main contractor Make Group to deliver the internal refurbishment of Beaudesert Park School's indoor swimming pool in Stroud. The project involved the installation of new drylining systems, internal wall finishes and a specialist Hunter Douglas ceiling system designed specifically for swimming pool environments.

Project Overview

Originally constructed in 1991, Beaudesert Park School's indoor swimming pool is an established part of the school's facilities, providing pupils with an important space for swimming, sport and recreation.

The renovation presented an opportunity to revitalise the existing facility, updating its internal finishes and building systems to create a refreshed, durable environment suitable for the demands of a swimming pool.

Working alongside main contractor Make Group, ISS Acoustic & Interiors was appointed to deliver a range of internal building systems, including metal framing, plasterboard, hardwall finishes and a specialist ceiling installation.

A key consideration was the swimming pool's environment. High humidity, moisture and airborne chemicals can place additional demands on internal building materials, making the selection of suitable systems particularly important.

The completed works provide an updated swimming pool environment, helping ensure this valued school facility can continue to serve its pupils for years to come.

SCOPE OF WORKS

Gypframe Metal Framing

Our team installed Gypframe metal framing systems to create the supporting framework for the new internal wall construction. Metal framing provides a lightweight, durable structure for fixing plasterboard and forming internal partitions and linings.

Plasterboard Installation

Plasterboard installation formed a key part of the internal refurbishment. Our works included the installation of plasterboard linings to provide suitable substrates for subsequent finishing works and contribute to the overall quality of the internal environment.

Hardwall Finishes

Hardwall was applied to designated internal surfaces to provide a robust, durable wall finish. This creates a solid substrate suitable for the specified decorative finishes and helps deliver a consistent appearance throughout the refurbished facility.

Specialist Hunter Douglas Ceiling System

One of the key elements of the project was the installation of a specialist Hunter Douglas ceiling system, specifically treated and selected for swimming pool environments.

Swimming pools present challenging internal conditions due to elevated humidity and potential exposure to corrosive elements. Selecting an appropriate ceiling system is therefore essential to maintaining performance, durability and appearance over time. The Hunter Douglas system provided a suitable ceiling solution for the particular environmental demands of the facility.

Lets Discuss Your Next Project

From commercial drylining and suspended ceilings to specialist systems for demanding environments, ISS Acoustic & Interiors delivers tailored internal solutions from specification through to installation. Get in touch with our team to discuss your next project and how we can help.

Client: Make Group / Beaudesert Park School

Sector: Education

Next
Next

Drylining & Interior Refurbishment for Coniston Medical Centre, Bristol